Rule of thumb is the joints spacing 24x slab thickness up to 36x slab thickness.
Construction joint in mat foundation.
Construction joints for strip and trench fill foundations may be formed by one of the methods shown below.
Construction joints are normally required in construction works because there is limited supply of fresh concrete in concrete batching plants in a single day and the size of concrete pour may be too large to be concreted in one go.
36 0 225 m 8 1 m.
Make sure to have a joint connecting into any re entrant corners.
All shuttering should be removed before work continues beyond the construction joint.
Lay out the pours first then lay out the control joints.
Thus you want control joints spaced between the construction joints by no more than 8m.
Since the raft foundations are constructed on the ground and it could be using as the ground floor or basement floor slab a water bar will be provided at the construction joint.
The messeturm mat foundation anon 1998.
I have a mat foundaiton 40m 20m lxb with several extreme equipment load on top settlement in each point is asked to be consist since those equipments are connectted by rigid large size pipe.
The diameter of the dowel bar could be t25 or t20.
My question is as follows.
The construction joint increased the 100 kpa permeability of 100 rh conditioned material by a factor of three compared to the control specimen and a factor of 70 compared to the pristine material.
I am going to study it via finite element analysis.
The nature and type of the construction joint of the raft foundations are more similar to that of the slab.
Whether i need set expansion joint for such large mat foundation 2.