You can still board directly on to the joists if you want but it is worth noting that this would not.
How to fit loft floor joists.
Clearing the loft area of all debris insulation struts and temporary boards to expose the ceiling boards.
Loft conversion floor joist spans see description you attic flooring 101 all you need to know bob vila beefing up attic joists for living e jlc online can you convert your attic to living e board vellum.
This can be done in two ways.
A new floor system is installed using a frame trimmer joists to support the floor joists that span the width of the loft.
Install the sister joists.
This is possible by constructing a dwarf timber stud wall 1m to 1 5m high known as an ashlering between the two.
With the supporting ashlering in place the internal struts and braces can now safely be removed.
Your sub floor joists should be at 400mm centres meaning the edge of the boards always falls on a joist too.
Joist hangers only proprietary joist hangers complying with bs 6178 part 1 1999 or bs en 845 1 can be used subject to the manufacturer s.
The best solution is to build a raised loft floor above the insulation details of which are shown below.
It is now a requirement to limit air leakage from the inside of buildings one main area where this situation can be improved is to effectively seal the gaps around floor joists where they bear into the external walls.
Continue to lay chipboard flooring across the joists for the rest of the floor ensuring the joints along the 600mm edges are staggered always avoid joining on the same joist wherever possible.
Furthermore squashing insulation down to fit joist height is a bad idea as this halves it s effectiveness doubling your heat loss.
In smaller lofts it is often the case that the floor joists themselves will be used to support the sloping rafters.
A basic floor system is installed in about 10 stages from preparation to boarding the floor.
Fit each new joist in place next to an old joist so their faces make full contact and their top edges are flush.