The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
How to glue down engineered hardwood flooring.
Typically this type of hardwood flooring is set up with a series of tongues and grooves so that they can be attached to one another.
The wall coverings and painting should be completed before the installation of the hardwood flooring.
Set the expansion gap.
The adhesive is spread on an area of the subfloor where the boards are going to be adhered to using a specialized trowel.
Tap the second row into.
Lay spacers along the walls to create the expansion gap specified in the manufacturer s.
Once you have decided to use the glue down floor method make sure that you leave a large enough expansion gap depending on the hardwood product you chose from the wall to allow the wood to contract and expand.
Apply the glue to a small area.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Before applying adhesives you must fill in any voids or deflections in the slab with a cementitious.
Installing a glue down engineered hardwood floor step 1.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low.
Glue down hardwood floors on concrete.
If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place.
Place the first row.
How to install glue down engineered wood flooring on concrete slab preparation.