Place the transition strip in the expansion joint and press down firmly.
How to glue down floor transition strips.
Mark the floor where the transition strip is to be located taking care to allow for any required expansion space as specified by the flooring manufacturer.
Then press it onto the floor.
Apply a 1 4 inch bead of flooring or construction adhesive along the center of the expansion joint.
Use construction adhesive if you glue it and 2 inch finish nails if you nail it.
Step 5 press the t molding into the gap firmly ensuring that the top of the molding rests firmly on each floor with no gaps.
Step 6 use a damp cloth to remove any excess glue.
Loose transition on a teragren floor can be a problem.
A seam binder is installed by simply positioning the strip over the seam then driving screws through pre dilled pilot holes in the strip to secure it to the subfloor in the gap between the floors.
Because it is attached to neither floor each floor can expand and contract without cracking the transition strip.
However if this happens to your floors read this blog to find out how to repair it.
Step 2 apply a 1 4 inch wide line of construction adhesive to the bottom of the transition strip where it will rest on the concrete.
You can attach the transition in one of two ways.
Drill 1 8 inch pilot holes for the nails.
Do not glue the lips to the floor.
If you are using liquid nails apply a bead of the liquid nails to the underside of the transition.