Most engineered flooring can be installed using staples full spread adhesive or a floating method over an approved subfloor.
How to install 3 4 hardwood flooring.
We continuously make technological advancements that improve product installer owner responsibility.
Make sure there are no squeaks in the floor.
They are available in 3 4 inch thickness as well as low profile styles that are 5 16 to 5 8 inch thick which are a good or installing over existing flooring.
Grade levels where moisture conditions do not exist.
It provides detailed instructions for installing hardwood flooring over a wood substructure.
You may need to use leveling compound to even your surface.
If the sub floor above is more than 1 inch thick this rule can be bent in many.
If there s a squeak screw a long drywall screw into the sub floor and joist where the squeak occurs.
It should be level and free from rot and other major defects.
Finish hardwood floor installation when you get to the last few rows switch back to nailing by hand.
Like unfinished hardwood floors the prefinished types typically have tongue and groove edges on all sides.
On the last row cut the pieces to fit measuring the distance from the wall to the board not the tongue minus the expansion gap.
Remove shoe molding from the room and sweep and clean thoroughly.
Most 3 4 inch solid hardwood flooring can be installed using nails or staples over an approved subfloor.
Check your sub floor condition.
Make sure you have a sturdy subfloor.
At the bottom we provide links to posts on the tools we use and frequently recommend for hardwood.
Minimum requirements are a 3 4 plywood sub floor.
We first ran this article in 2010.
It is the responsibility of the installer and owner to ensure that job site.
3 4 inch cdx plywood is preferred and 3 4 inch osb is acceptable.
It chronicles tutorials for each step of the process derived from our installation of 3 4 inch solid tongue and groove brazilian walnut hardwoods in our own home.