But if you re thinking of installing a tile shower floor you ve got some decisions to make when it comes to your method of installation.
How to install a ceramic shower base.
Materials and tools needed.
Attach the membrane starting in one corner flatten the membrane against the bottom of the space and push it tight against the bottom of the form board.
Curb or curb less shower.
Select one the same length as the tub and you won t even need to add filler walls.
Place tile spacers flat side down along the shower base where it meets the shower base flange.
An important decision you have to make when planning your walk in shower is choosing the type of floor you want to install and i m not talking about materials which is something else you need to decide later on.
Time to replace that old nasty shower.
3 popular choices for a custom shower pan.
Select a shower base that has the drain located at one end right or left chosen to match your old tub drain.
Due to the premolded slope.
Since the drain position roughly matches the tub drain you may not have to add a separate vent cut out and patch the floor or reroute the drain line.
The primary goal of the shower base is to create a sloped floor angled toward the drain so the waste water flows efficiently into the pipes.
Easy by brewing up a nice hot cup of joe and w.
You might need a helper for this part to hold the backer board in place while you attach it.
It s a good idea to mark the studs before installing so you know where to drill.
What do you do.
Then you ll need a new shower pan.
All three of these methods will result in a professional quality.
If your next bathroom remodel includes a tub or prefab fiberglass shower base then the installation is going to be pretty straightforward.
In our project we installed the board on the shower wall at 72 1 2 from the top.
Use a starter board as a straight edge whenever you do a vertical tile installation to ensure panels go in straight and level image 1.
For the floor of your shower or shower pan there are two basic options.
Use shims at the base to set a 1 4 inch expansion gap.
Where do you start.
Attach the membrane to the studs with large head nails at least 8 from the bottom of the form.
Some of the basics required include.
Screw the starter board directly into the cement board and remove it after completing a series of panels.