Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
How to install bamboo click flooring on concrete.
The beauty and efficiency of bamboo click flooring may depend on the installation process on some levels.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
Floating the floor using tongue and groove flooring not parquet block 2.
Click here to cancel reply.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
For both wood and concrete subfloors the radiant heat should be turned on for approximately one week to ensure excess moisture is removed.
Floating the floor using uniclic flooring.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
The two main installation methods over concrete.
The glue down method can be used for solid or engineered bamboo flooring.
Clean the floor well with a pressure washer if it is an older concrete floor to remove any sealers.
We have provided all of the steps you need to know in order to install bamboo on a concrete subfloor as well as how to maintain if afterwards.
The most important factor is to use an approved urethane wood floor adhesive with vapor sound barrier and the trowel that is used specifically for that adhesive in this method you will adhere the bamboo flooring directly to the concrete slab.
This means looking at either the strand woven click bamboo or the 9mm bamboo.
Secret nailing the floor down to a wood subfloor.
However because of the evolution of technology it is now very easy to install bamboo click flooring like a pro.