Mortar is basically the adhesive that helps the tile stick to the concrete so choose the one that best suits your needs and your current situation.
How to install ceramic tile on concrete basement floor.
Lay the tiles into the mortar and using the spacers make sure you are running even with the chalk line.
Cut the tiles to the desired size with a nipper then mark the room flooring to make quadrant divisions with horizontal and vertical lines once the tiles have dry set.
Check the distance between tiles and note the location of the.
Decide on the pattern to be installed and dry set it.
Then prime the concrete see photo 2 with the recommended solution consult the membrane manufacturer s literature.
Skip this step and we guarantee your new tile will crack right over the cracks in the concrete.
For ceramic tile nail cement boards to the concrete floor with concrete nails so they won t move then apply mastic tile and grout.
Rather than using cement boards cbus the favored method is to use an uncoupling membrane.
Dry fit the tiles on floor.
The commercially available mortars generally need to be mixed with a proportional amount of water.
If you find moisture you will need to abandon the.
Lay several porcelain tiles in a row using spacers to simulate joints.
Use tile spacers for grout joints.
It will be the guide to ensure that the tile application will fit the area of the flooring.
Tape a large piece of plastic over the concrete floor securing all edges with duct tape.
Measure a 2 foot section of tile.
More than almost any other type of floor covering tile needs a rock solid base.
Let the primer dry and then apply the membrane photos 3 and 4.
Use a level to ensure that it is correctly aligned with the surface.
If you feel that despite all precautions the basement floor may get wet put down 2 by 4 inch sleepers cover with plastic and then install the plywood as the subfloor.
If you attach the tile to concrete you need to take special precautions by uncoupling the tile from the concrete.
Cut the membrane so it s 1 1 2 times the width of your tiles.
Wait 24 hours and check under the plastic for moisture.
Once everything is ready start by applying a layer of mortar to the floor.