Follow these steps install engineered hardwood over a concrete floor.
How to install engineered wood flooring over plywood without baseboards.
When you re installing a naturally porous and flexible relatively material like bamboo wood you have to let it acclimate to the space you re installing it in so it can expand or contract based on the humidity temperature and elevation in your home.
Installing a glue down engineered hardwood floor.
Watch as jack explains what s involved in floating installation of engineered hardwood flooring.
You need to leave a 5 16 inch gap between the flooring and the baseboard or wall around the perimeter of the room to allow the floor enough space to expand.
Considering new hardwood floors.
Roll out sheets of tar paper over the clean subfloor and use a staple gun to affix the paper to the floor.
The planks glue together to create a floor that floats moves freely as a unit.
You ll learn what tools you.
The tar paper will form a moisture barrier which will prevent any condensation from the floors below which could potentially rot away at the underside of your new wood flooring.
Engineered flooring goes down over a thin foam sheet which provides cushioning and sound dampening.
Stop and leave enough space to comfortably exit the room without stepping on the new floor.
Wait 24 hours for the glue to dry.
Staple down installation over a plywood subfloor.