Any installation of wooden flooring over a concrete slab must be carried out only after having a polyethylene vapor barrier on the ground where the concrete slab is laid and on the top of the concrete slab.
How to install pine flooring on concrete slab.
So if you want wood floors and are dealing with concrete don t worry.
Nail the floor every 2 ft.
Concrete slab with plywood sub floor 1 inch height allowance.
This method requires you taping a 16 inch square piece of clear plastic at least 6 mils thick to the floor.
Lay the section on the concrete slab and use moisture resistant tape to tape all four sides to the floor.
Plywood to the concrete.
Wood planks to the plywood.
A layer of polyethylene film covering the concrete floor.
There are three primary methods to installing floorboards on a concrete slab.
One method the sleeper on slab system lost popularity 30 years ago because it added too much height to the floor.
Lay a plastic moisture barrier and then screw 3 4 in.
This is to prevent the moisture penetration from the ground into the concrete slab which can cause swelling or buckling of the wood floor.
Place a layer of 6mm polyethylene onto the concrete as your moisture barrier.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
Wood floor over concrete than over a wood subfloor.
A vapor barrier is necessary between the concrete and the pine to prevent the wood from swelling due to high humidity from the concrete.
In fact many homes are built on a concrete slab rather than a crawl space.
Allow 12 hours drying time before finishing your floors.
But it s considerably more difficult to install a 3 4 in.
The answer is yes.
We caution against the plastic sheet method for testing moisture levels in your concrete slab.
Using a hilti direct fastening tool shoot concrete nails into 1 2 inch plywood to apply directly onto concrete.
Insert shims for even gaps and nail through the tongue of the board with a flooring stapler.
Start at one end of the board and work to the other nailing every 2 ft.
How to install tongue and groove flooring.