Use the garden rake to smooth and do a rough leveling of the gravel in the stall.
How to install rubber stall mats.
For stalls with bare dirt or clay floors you will need enough gravel crushed rock sized 3 8 to 5 8 to fill the.
Uneven areas can be blocked with pressure treated or outdoor rated wood.
Horse stall mats are best installed over concrete asphalt wood or any level well compacted surface.
But what really is the best method to cut stall mats.
By brett hart while horse stall mats can come in many different forms one thing remains steady having the proper subsurface will make huge difference for everything from having a level finished surface to minimizing seams to drainage.
First gather together the following supplies.
Know how is what we want to cover here.
Well it s actually not that hard to do if you know how just like everything else.
One of the things people ask is how to properly install rubber mats inside of your horse stall.
Most of the stall mats you ll find in tack stores come in 4 x6 x3 4 size so you ll need 6 mats for a 12 x12 horse stall.
If you have a concrete asphalt or wood floor in your stall skip to step 8.
Skip this step if your stall already has a lip or an edge at least 2 high.
Compact gravel with hand compactor.
Stall mats enough to cover the entire stall two vice grips four is even better carpet knife also called a utility knife straight.
Dig the stall floor down at least three inches from where you want the surface top.
Prepping a non solid subsurface.
If you have concrete floors you can skip to step 6 step 1.
Gradually add 5 8 minus gravel spreading as you go up to the top of the 2 x 4.
Attach the treated 2 x 4 board across the inside of the stall doorway note.
Use the 6 8 2 x 4 and carpenter s level to move the gravel around until the gravel in the entire stall is level.
Reading forums people recommend everything from a skill saw to a electric meat cutting knife.