The subfloor must be clean and smooth before installing the slate tiles over it.
How to install slate flooring on concrete.
Trace that tile template onto the floor remove the template and snap a red chalk line on each axis of the traced template.
Set the tile.
Preparation of the subfloor.
Install the second plank by holding it at an angle and inserting its tongue edge into the first plank s groove edge.
Check the concrete surface to check if it is level using either a 4 foot or an 8 foot level.
Installing slate tile over a concrete base.
Spread the thinset over the concrete with a.
Procedure to install slate tiles 1.
How to install slate tile over concrete step 1.
Step 5 use the grout.
Step 2 level the floor.
Spread enough mortar for one or two tiles at a time.
Before starting with the installation you should remove all possible flooring and coverings.
Lay the first plank appropriately spaced from the wall.
Cement board sheets installed on the subfloors protects the lower surfaces of the floor.
The grid that you re creating will be the guideline for setting the field tile.
In this 3rd part i show how i used slate tiles to finish the job.
When ready place the specially sized piece into the space to complete your first line.
Step 1 preparation.
Lower the second plank to snap the planks together.
Step 3 use thinset.
Then use a damp sponge to wet each tile before you lay it on the mortar.
Step 4 install the tiles.
Be careful if you re spreading enough mortar for more than one tile because you don t want the mortar to dry out.
Natural stone and slate tile is a beautiful choice for home décor.
You can install slate tile flooring yourself by laying the tile with mortar and grouting it.
While it is an investment it is long lasting and easy to clean.
Use spacers between the tiles.
The older flooring will need.
Space it out with 1 8 inch spacers.
Measure the distance from the tile spacer on the last piece to the end of the room.
Then employ a wet saw to cut a tile down to the dimensions necessary to fill that area in.
Mix a batch of thinset such as flexbond in a 5 gallon bucket.
Laying the outdoor slate tile.
Once the first row of slate tiles reaches the wall you will often end up with a gap.
Continue in this manner for the remainder of the row trimming the last plank as needed.