Can a foam pad be use under solid hardwood flooring description.
How to install wood flooring on plywood.
To learn how to do this watch prepping plywood subfloors.
This flooring can be installed over old wood flooring or over a plywood sub floor.
Let hardwood acclimate in the room you re installing it in for five days prior to installation to temperatures of 65 degrees to 75 degrees and recommended humidity levels of 30 to 55 percent.
Always follow the manufacturer s instructions.
Installation starts with one sheet of plywood placed perpendicular to the joists in one corner.
To determine the amount of flooring you ll need multiply the length times the width of the room to get the square footage then add 10 percent for waste and damaged boards.
Loosely lay a nailing surface of 3 4 4 x 8 exterior plywood panels over the entire area leaving a 3 4 space at the wall line and 1 4 to 1 2 between panels.
Installing hardwood floor 155149312 57e967d45f9b586c35ade84a via.
The key to a beautiful long lasting hardwood or laminate floor is a well prepared subfloor.
Do this by multiplying the room s length by its width.
Hardwood floors should be installed over inch plywood on or above grade not in a basement and never directly on concrete.
Install the plywood after the vapor retarder is in place.
Wood floor installation requires a level subfloor and that your hardwood flooring is acclimated to the room s humidity and temperature according to the manufacturer s guidelines.
A minimum 3 4 inch thick sub floor is required.
If you are working atop a single plywood layer we recommend adding a second layer of 1 4 to 1 2 inch plywood or commercial floor substrate material.
Use wood or drywall screws to attach the substrate to the floor joists.
For additional strength builders will often stagger the panels by cutting the first panel in the.
Stack flooring log cabin style or just spread it around the room but not directly on concrete.