While most residential construction uses 2x8 joists with 16 inch spacing there are many other factors you need to consider when determining the proper joist span length.
How to laminate floor joists.
Some floor humps signal structural problems.
Address any subfloor problems before doing any type of laminate floor installation.
Set a hydraulic jack and post under the beam and jack up the joists about 1 8 in.
Joist span and spacing is set by your local building code.
Then fill the holes with wood filler.
That said some times it s not possible to.
Installing a laminate wood ceiling.
If the hump isn t due to underlayment adhesion or subfloor delamination it could be the result or one or more broken or cut joists.
Most directions recommend running laminate flooring perpendicular to floor joists.
It will depend on the spacing of your joists.
Floor joists are installed early in the building process and this work is typically done by the framing carpenter since it is part of the structure of the home.
Or if separating floor from subfloor is causing the creak drive two nails at opposite 45 degree angles into joists which you can locate with a stud finder.
A day until they re level.
Once a foundation is poured the framing contractor goes to work building the skeleton of the building part of which is the flooring area.
Easy to install tongue and groove planks add architectural interest to a vaulted ceiling.
This provides added strength to the floor and helps cut down on bowing in the laminate.
Run laminate perpendicular to joists.
Then set new joists same height as existing ones alongside the old.
Tack a beam under the sagging joists.
Check the manufacturer s instructions.
Stagger the end joints of planks for a more professional look as you would when laying a hardwood floor.
If the uneven floor is due to floor joists that have warped or twisted over time or were incorrectly installed the only way to level the floor is to remove the subflooring and shim the joists.