If the floor is uneven you need to address a few things to create a flat floor for the laminate flooring.
How to lay laminate on cement floor.
It is necessary for them to adapt to the humidity and the temperature of the.
However many homeowners are disappointed to discover that solid wood flooring cannot be installed on a concrete slab.
Next cut strips of underlayment to size and lay the strips down across the exposed floor.
The previous owner put the really old style tiles on top of concrete.
My contractor wants to install laminate on top of floor.
Multiply length times width of the room.
This article is about how to lay laminate flooring on concrete.
In colorado dry basement built 1961.
No matter the weather or season a laminate wood floor should be a silent expanse that runs through your living spaces.
You ll also want to tear up any carpet in the room and remove the leftover tack strips.
Add about 10 to that number to account for any possible mistakes and warped boards.
The laminate flooring is cheap and comes in a large diversity of colors thicknesses and finishes as you can easily find one to fit your needs and tastes perfectly.
When installing a laminate floor on top of old tile on top of concrete basement floor.
Laying laminate flooring on uneven concrete can lead to problems.
Determine how much flooring and materials will be needed.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Laminate flooring is also fairly easy to install.
Remove any carpet or other flooring.
Many types of flooring can be installed over a concrete sub floor.
Moreover the laminate flooring is easy to maintain and durable if you clean it regularly with appropriate products.
To lay laminate flooring first clear out any furniture in the room you ll be laying the floor in.
Make a final check with the level to be sure all the high and low spots are gone.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
Before the installation itself leave laminate boards in the room for some time.
There are also tiles missing here and there.