Concrete is extremely hard so homeowners might mistakenly believe it is impenetrable.
How to lay laminate timber flooring on concrete.
For long term performance your laminate wood floor needs to be dry level and clean.
The challenges of laying laminate on concrete.
Typical sight lines run parallel to the longest wall but each home is different.
How to install laminate flooring over concrete important.
Protecting laminate flooring from moisture.
The laminate flooring is cheap and comes in a large diversity of colors thicknesses and finishes as you can easily find one to fit your needs and tastes perfectly.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
This article is about how to lay laminate flooring on concrete.
Treated plywood to the concrete with concrete screws spaced every 16 in.
These are the challenges.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
For a concrete subfloor you should install the plank with the sight lines of the floor.
Measure and mark the center of all four walls at floor level.
Moreover the laminate flooring is easy to maintain and durable if you clean it regularly with appropriate products.
This will allow them to acclimate to the room s temperature and humidity.
Let s start with the moisture problem.
Before the installation itself leave laminate boards in the room for some time.
They should acclimate for at least 48 hours.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Picking the right underlay installation process.
Lay out the unopened boxes of laminate planks in the room.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
Having complete focus on process as well as researching prior to the event are important keys here.