If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
How to lay thin laminate flooring.
Lay moisture barrier thoroughly clean the subfloor so that there is no debris on the floor and that it is flat and smooth.
Determine how much flooring and materials will be needed.
Multiply length times width of the room.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
How to install laminate flooring.
In this video jon and i install a laminate or floating floor in one of his bedrooms at his house.
Save the trimmed sections because you can use these pieces to start other rows.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
To cut the flooring lay the board on its face bottom up and cut with a saw equipped with a fine tooth blade for flooring.
Laminate flooring is a great choice for homeowners who want the look of real hardwood at more affordable costs.
Begin laying the first row on the longest wall with the trimmed edges of the planks against the wall.
Like traditional wood laminate flooring is available in a variety of colors to complement virtually all design styles.
Laminate is considered by flooring industry professionals to be one of the toughest types of surfaces on the market.
Lay out the unopened boxes of laminate planks in the room.
This will allow them to acclimate to the room s temperature and humidity.
Like other types of floor covering many different grades and styles are available.
Lay down a full size plank against the wall spacing it about 1 4 to 3 8 inch as directed by the manufacturer away from the wall and making sure the groove edge faces out.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
Step 1 let the boards acclimate.
Directly onto the subfloor lay down a layer of plastic sheeting to create a moisture barrier.
Start on the right side and work to the left.
Add about 10 to that number to account for any possible mistakes and warped boards.
They should acclimate for at least 48 hours.