Unlike the moisture barrier you do not want the edges to overlap unless they come with a built in adhesive strip.
How to lay timber flooring on concrete.
This will prevent any excess moisture from wicking from the concrete directly into the wood.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
You don t want be trapped in a corner and have to walk on the newly installed floors.
Lay down a moisture barrier.
Install a underlayment on concrete floor in basement over the moisture barrier to help soundproof your floor.
Follow these steps with care to safely complete the installation yourself.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Treated plywood to the concrete with concrete screws spaced every 16 in.
By eliminating the paint it ensures that the adhesive is going to stick to your concrete.
Normal room temperature and humidity conditions must be maintained for the entire.
If you are using an old floor and it has previous paint you ll have no other option but to remove it.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Cut pieces as you go.
Lay the floor parallel to longest wall in the room.
Flooring usually takes three to five days to acclimate but the real test of acclimation is when its moisture content as measured by a meter has fallen to within 4 percent of that of the subfloor.
Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
Unpack the flooring and spread it around the room to acclimate.