Spread it over the entire surface of the floor with the push broom and apply downward pressure to work it into the pores of the concrete.
How to level floor with concrete piers.
4 or 5 rebar rods into the tube.
Make sure to smooth out any puddles of primer to end up with an even coat.
Apply concrete leveler primer to the floor with a soft bristle push broom.
Should rebar be required pour concrete into the system first.
The interior is adjusted by adding or removing shims placed on top of the interior pads or columns.
Just make sure the posts are perfectly plumb just grind it level.
If you are in an area without frost then the form should be backfilled 2 feet to hold it in place when it is being filled with concrete.
You can cut a slight angle at the bottom of the posts or shim the top of the pier with concrete to make a level surface.
Then with the post anchors properly aligned with your string lines level the piers in both directions.
Assign a person to each jack and raise the jacks slowly and at the same time until the spirit level shows the house is level.
Place heavy duty floor jacks under the low spots.
Pier beam foundation leveling.
Attach a level string line on the sagging girder beam by tacking a nail diagonally into the lower corner of the beam at two points as near to the ends as possible or at a minimum spanning the depressed floor area.
Keep the concrete damp for two days allowing it to cure slowly.
Install your footings 4 to 6 inches below the forst line to avoid potential movement.
A pier beam foundation can be repaired and leveled by installing steel pilings or concrete pilings under key locations under the concrete perimeter beam.
Insert three or four no.
Use an underlayment floor leveler or floor patch product to fix low spots in a wood or concrete subfloor.
Run a line outside the house and mark the low spots in the foundation.
It s used to help insulate absorb sound and reduce wear on your floor.
Different situations call for different tools.